CDOT was looking to construct a new 11,000 square-foot 10-bay Vehicle Storage Facility (VSF) with an admin bay, a sand shed, and a 5-tank mag-chloride containment structure in Evergreen, CO. The facility was to include two wash bays for CDOT vehicles, served by a reclaimed water system that conserves and recycles well water. Interior trench drains in the wash and storage bays connect to (4) underground interceptor-style tanks outside the building.
360 Engineering provided mechanical and plumbing engineering design, working alongside VEGA Architecture. Due to its proximity and timing with the I-70 Floyd Hill project, the work was completed on a fast-track schedule: four (4) weeks from project start to 65% CDs, three (3) weeks from feedback to 85% CDs, and just two (2) weeks from feedback to 99% permit drawings.
Using template drawings and specifications for CDOT vehicle storage facility/wash bay buildings, we adapted the design to the site’s exact size, location, and orientation. Aside from reusing an existing well for domestic water service, the VSF/wash bay was a ground-up build.